ADC32J23EVM

Mfr. #: ADC32J23EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE ADC32J23
Lifecycle: New from this manufacturer.
Datasheet: ADC32J23EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC32J23EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC Bulk is the packaging method for this product This product's 80M. Data-Interface: JESD204B Serial 12 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADC32J23 This product operates at a 1.8 V supply voltage for reliable performance. This product is an Dual Channel 12 bit 80 MSPS ADC. This tool is designed for the ADC32J23. Serial interface type

ADC32J23EVM Image

ADC32J23EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC32J23EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • Packaging Bulk
  • Sampling-Rate-Per-Second 80M
  • Data-Interface JESD204B Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC32J23
  • Power-Typ-Conditions 329mW @ 80MSPS
  • Operating-Supply-Voltage 1.8 V
  • Description-Function Dual Channel 12 bit 80 MSPS ADC
  • Tool-Is-For-Evaluation-Of ADC32J23
  • Interface-Type Serial

ADC32J23EVM

ADC32J23EVM Specifications

ADC32J23EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 80M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is JESD204B Serial.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADC32J23.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Dual Channel 12 bit 80 MSPS ADC.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADC32J23

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed Serial

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$448.50
$448.50
10
$426.08
$4 260.75
100
$403.65
$40 365.00
500
$381.22
$190 612.50
1000
$358.80
$358 800.00
Top