ADC32J24EVM

Mfr. #: ADC32J24EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE ADC32J24
Lifecycle: New from this manufacturer.
Datasheet: ADC32J24EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC32J24EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC Bulk is the packaging method for this product This product's 125M. Data-Interface: JESD204B Serial 12 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADC32J24 This product operates at a 1.8 V supply voltage for reliable performance. This product is an Dual Channel 12 bit 125 MSPS ADC. This tool is designed for the ADC32J24. Serial interface type

ADC32J24EVM Image

ADC32J24EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC32J24EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • Packaging Bulk
  • Sampling-Rate-Per-Second 125M
  • Data-Interface JESD204B Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC32J24
  • Power-Typ-Conditions 401mW @ 125MSPS
  • Operating-Supply-Voltage 1.8 V
  • Description-Function Dual Channel 12 bit 125 MSPS ADC
  • Tool-Is-For-Evaluation-Of ADC32J24
  • Interface-Type Serial

ADC32J24EVM

ADC32J24EVM Specifications

ADC32J24EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 125M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is JESD204B Serial.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 2.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADC32J24.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1.8 V

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Dual Channel 12 bit 125 MSPS ADC

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADC32J24.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed Serial

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$464.34
$464.34
10
$441.12
$4 411.23
100
$417.91
$41 790.60
500
$394.69
$197 344.50
1000
$371.47
$371 472.00
Top