ADC3422EVM

Mfr. #: ADC3422EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE ADC3422
Lifecycle: New from this manufacturer.
Datasheet: ADC3422EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADC3422EVM Overview

Product belongs to the - series. Tube is the packaging method for this product This product's 50M. Data-Interface: LVDS - Serial 12 bits 4 units Input range: 2 Vpp Included item: Board. IC package type: ADC3422

ADC3422EVM Image

ADC3422EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3422EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Packaging Tube
  • Sampling-Rate-Per-Second 50M
  • Data-Interface LVDS - Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 4
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADC3422
  • Power-Typ-Conditions 228mW @ 50MSPS

ADC3422EVM

ADC3422EVM Specifications

ADC3422EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Tube.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 50M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed LVDS - Serial

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 4

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADC3422

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$438.81
$438.81
10
$416.86
$4 168.65
100
$394.92
$39 492.47
500
$372.98
$186 492.20
1000
$351.04
$351 044.20
Top