| Mfr. #: | ADC3441EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVAL MODULE ADC3441 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | ADC3441EVM Datasheet |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC Bulk is the packaging method for this product This product's 25M. Data-Interface: LVDS - Serial 14 bits 4 units Input range: 2 Vpp Included item: Board. IC package type: ADC3441 This product operates at a 1.8 V supply voltage for reliable performance. This product is an ADC3441 14 bit 4 channel 25 Msps analog to digital converter. This tool is designed for the ADC3441. Serial LVDS interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADC3441EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is ADC.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: At what frequency does the Sampling-Rate-Per-Second?
Q: The product Sampling-Rate-Per-Second is 25M.
A: What is the Data-Interface of the product?
Q: The Data-Interface of the product is LVDS - Serial.
A: What is the Number-of-Bits of the product?
Q: The Number-of-Bits of the product is 14.
A: What is the Number-of-A-D-Converters of the product?
Q: The Number-of-A-D-Converters of the product is 4.
A: What is the Input-Range of the product?
Q: The Input-Range of the product is 2 Vpp.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is ADC3441.
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 1.8 V.
A: At what frequency does the Description-Function?
Q: The product Description-Function is ADC3441 14 bit 4 channel 25 Msps analog to digital converter.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is ADC3441.
A: What is the Interface-Type of the product?
Q: The Interface-Type of the product is Serial LVDS.