| Mfr. #: | ADS1218EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVAL MOD FOR ADS1218 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | ADS1218EVM Datasheet |


Product belongs to the - series. This product's 1k. Data-Interface: SPI 24 bits 1 units Input range: - Included item: Board. IC package type: ADS1218

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1218EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is -.
A: What is the Sampling-Rate-Per-Second of the product?
Q: The Sampling-Rate-Per-Second of the product is 1k.
A: What is the Data-Interface of the product?
Q: The Data-Interface of the product is SPI.
A: At what frequency does the Number-of-Bits?
Q: The product Number-of-Bits is 24.
A: Is the cutoff frequency of the product Number-of-A-D-Converters?
Q: Yes, the product's Number-of-A-D-Converters is indeed 1
A: Is the cutoff frequency of the product Input-Range?
Q: Yes, the product's Input-Range is indeed -
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is ADS1218.