| Mfr. #: | ADS1251EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVAL MOD FOR ADS1251 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | ADS1251EVM Datasheet |


Product belongs to the ResolutionPLUS series. This product's 20.8k. Data-Interface: Serial 24 bits 1 units Input range: ±VREF Included item: Board. IC package type: ADS1251

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1251EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is ResolutionPLUS.
A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?
Q: Yes, the product's Sampling-Rate-Per-Second is indeed 20.8k
A: Is the cutoff frequency of the product Data-Interface?
Q: Yes, the product's Data-Interface is indeed Serial
A: What is the Number-of-Bits of the product?
Q: The Number-of-Bits of the product is 24.
A: At what frequency does the Number-of-A-D-Converters?
Q: The product Number-of-A-D-Converters is 1.
A: What is the Input-Range of the product?
Q: The Input-Range of the product is ±VREF.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is ADS1251.