ADS1626EVM

Mfr. #: ADS1626EVM
Manufacturer: Texas Instruments
Description: EVALUATION MODULE FOR ADS1626
Lifecycle: New from this manufacturer.
Datasheet: ADS1626EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS1626EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC Bulk is the packaging method for this product This product's 1.25M. Data-Interface: Parallel 18 bits 1 units Input range: 0 ~ 4.7 V Included item: Board. IC package type: ADS1626 This product operates at a 8 V to 40 V supply voltage for reliable performance. This tool is designed for the ADS1626.

ADS1626EVM Image

ADS1626EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS1626EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Packaging Bulk
  • Sampling-Rate-Per-Second 1.25M
  • Data-Interface Parallel
  • Number-of-Bits 18
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 4.7 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS1626
  • Power-Typ-Conditions 515mW @ 1.25MSPS, 5 V AVDD
  • Operating-Supply-Voltage 8 V to 40 V
  • Tool-Is-For-Evaluation-Of ADS1626

ADS1626EVM

ADS1626EVM Specifications

ADS1626EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 1.25M

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Parallel.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 18.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ 4.7 V.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS1626

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 8 V to 40 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS1626.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$242.43
$242.43
10
$230.31
$2 303.08
100
$218.19
$21 818.70
500
$206.07
$103 032.75
1000
$193.94
$193 944.00
Top