ADS4229EVM

Mfr. #: ADS4229EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR ADS4229
Lifecycle: New from this manufacturer.
Datasheet: ADS4229EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4229EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC This product's 250M. Data-Interface: USB 12 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS4229 This product operates at a 5 V supply voltage for reliable performance. This tool is designed for the ADS4229. SPI interface type

ADS4229EVM Image

ADS4229EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4229EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • Sampling-Rate-Per-Second 250M
  • Data-Interface USB
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS4229
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 5 V
  • Tool-Is-For-Evaluation-Of ADS4229
  • Interface-Type SPI

ADS4229EVM

ADS4229EVM Specifications

ADS4229EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 250M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is USB.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 2.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 2 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS4229.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS4229

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$448.50
$448.50
10
$426.08
$4 260.75
100
$403.65
$40 365.00
500
$381.22
$190 612.50
1000
$358.80
$358 800.00
Top