ADS4249EVM

Mfr. #: ADS4249EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR ADS4249
Lifecycle: New from this manufacturer.
Datasheet: ADS4249EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4249EVM Overview

Product belongs to the - series. This product is categorized as Demonstration Boards This product's 250M. Data-Interface: SPI, USB 14 bits 2 units Input range: 1 ~ 2 Vpp Included item: Board. IC package type: ADS4249 This product operates at a 1.7 V to 1.9 V supply voltage for reliable performance. This tool is designed for the ADS4249. CMOS LVDS interface type

ADS4249EVM Image

ADS4249EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4249EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Demonstration Boards
  • Sampling-Rate-Per-Second 250M
  • Data-Interface SPI, USB
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 1 ~ 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS4249
  • Power-Typ-Conditions 560mW @ 250MSPS
  • Operating-Supply-Voltage 1.7 V to 1.9 V
  • Tool-Is-For-Evaluation-Of ADS4249
  • Interface-Type CMOS LVDS

ADS4249EVM

ADS4249EVM Specifications

ADS4249EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Demonstration Boards

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 250M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is SPI, USB.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 14.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 1 ~ 2 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS4249

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.7 V to 1.9 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS4249.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed CMOS LVDS

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$448.50
$448.50
10
$426.08
$4 260.75
100
$403.65
$40 365.00
500
$381.22
$190 612.50
1000
$358.80
$358 800.00
Top