ADS42B49EVM

Mfr. #: ADS42B49EVM
Manufacturer: Texas Instruments
Description: MODULE EVAL FOR ADS42B49
Lifecycle: New from this manufacturer.
Datasheet: ADS42B49EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS42B49EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS42B49 amplifier. This product's 250M. Data-Interface: LVDS - Parallel, Serial 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS42B49 This product operates at a 5 V supply voltage for reliable performance. This product is an ADS42B49EVM evaluation module. This tool is designed for the ADS42B49. 330 mA is 92 nA. Parallel Serial interface type

ADS42B49EVM Image

ADS42B49EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS42B49EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS42B49
  • Sampling-Rate-Per-Second 250M
  • Data-Interface LVDS - Parallel, Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS42B49
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 5 V
  • Description-Function ADS42B49EVM evaluation module
  • Tool-Is-For-Evaluation-Of ADS42B49
  • Operating-Supply-Current 330 mA
  • Interface-Type Parallel Serial

ADS42B49EVM

ADS42B49EVM Specifications

ADS42B49EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is ADS42B49.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 250M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is LVDS - Parallel, Serial.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 14.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS42B49

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed ADS42B49EVM evaluation module

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS42B49.

  • A: What is the Operating-Supply-Current of the product?

    Q: The Operating-Supply-Current of the product is 330 mA.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed Parallel Serial

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$448.50
$448.50
10
$426.08
$4 260.75
100
$403.65
$40 365.00
500
$381.22
$190 612.50
1000
$358.80
$358 800.00