ADS4449EVM

Mfr. #: ADS4449EVM
Manufacturer: Texas Instruments
Description: ADS4449EVM EVALUATION MODULE
Lifecycle: New from this manufacturer.
Datasheet: ADS4449EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS4449EVM Overview

Product belongs to the ADS4449 series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS4449 amplifier. This product's 250M. Data-Interface: DDR LVDS 14 bits 4 units Input range: 2 Vpp Included item: Board. IC package type: ADS4449 This product operates at a 6 V supply voltage for reliable performance. This product is an Evaluation provides a platform for a quad-channel 14 bit analog-to-digital converter. This tool is designed for the ADS4449. SPI USB interface type

ADS4449EVM Image

ADS4449EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS4449EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series ADS4449
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS4449
  • Sampling-Rate-Per-Second 250M
  • Data-Interface DDR LVDS
  • Number-of-Bits 14
  • Number-of-A-D-Converters 4
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS4449
  • Power-Typ-Conditions 1.47W @ 250MSPS
  • Operating-Supply-Voltage 6 V
  • Description-Function Evaluation provides a platform for a quad-channel 14 bit analog-to-digital converter
  • Tool-Is-For-Evaluation-Of ADS4449
  • Interface-Type SPI USB

ADS4449EVM

ADS4449EVM Specifications

ADS4449EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is ADS4449.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed ADS4449

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 250M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is DDR LVDS.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 14.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 4.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS4449

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 6 V.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Evaluation provides a platform for a quad-channel 14 bit analog-to-digital converter.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS4449

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$693.57
$693.57
10
$658.89
$6 588.91
100
$624.21
$62 421.30
500
$589.53
$294 767.25
1000
$554.86
$554 856.00
Top