ADS5120EVM

Mfr. #: ADS5120EVM
Manufacturer: Texas Instruments
Description: MODULE EVAL FOR ADS5120
Lifecycle: New from this manufacturer.
Datasheet: ADS5120EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5120EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 40M. Data-Interface: Parallel 10 bits 2 units Input range: 1 Vpp Included item: Board. IC package type: ADS5120 This product operates at a 1.8 V to 3.3 V supply voltage for reliable performance. This tool is designed for the ADS5120. SMA interface type

ADS5120EVM Image

ADS5120EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5120EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 40M
  • Data-Interface Parallel
  • Number-of-Bits 10
  • Number-of-A-D-Converters 2
  • Input-Range 1 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5120
  • Power-Typ-Conditions 794mW @ 40MSPS
  • Operating-Supply-Voltage 1.8 V to 3.3 V
  • Tool-Is-For-Evaluation-Of ADS5120
  • Interface-Type SMA

ADS5120EVM

ADS5120EVM Specifications

ADS5120EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 40M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 10

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 1 Vpp

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS5120.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V to 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS5120

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$560.79
$560.79
10
$532.75
$5 327.50
100
$504.71
$50 471.10
500
$476.67
$238 335.75
1000
$448.63
$448 632.00
Top