ADS5400EVM

Mfr. #: ADS5400EVM
Manufacturer: Texas Instruments
Description: EVALUATION MODULE FOR ADS5400
Lifecycle: New from this manufacturer.
Datasheet: ADS5400EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5400EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 1G. Data-Interface: LVDS - Serial 12 bits 1 units Input range: 2 Vpp Included item: Board. IC package type: ADS5400 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS5400.

ADS5400EVM Image

ADS5400EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5400EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 1G
  • Data-Interface LVDS - Serial
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5400
  • Power-Typ-Conditions 2.45W @ 1GSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS5400

ADS5400EVM

ADS5400EVM Specifications

ADS5400EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 1G

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is LVDS - Serial.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 12.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 2 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS5400.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS5400.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$2.00
$2.00
10
$2.00
$20.00
100
$2.00
$200.00
500
$1.00
$500.00
1000
$1.00
$1 000.00
Top