ADS5404EVM

Mfr. #: ADS5404EVM
Manufacturer: Texas Instruments
Description: ADS5404EVM EVALUATION MODULE
Lifecycle: New from this manufacturer.
Datasheet: ADS5404EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5404EVM Overview

Product belongs to the ADS5404 series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS540x ADS54T0x amplifier. This product's 500M. Data-Interface: DDR LVDS 12 bits 2 units Input range: 1 Vpp Included item: Board. IC package type: ADS5404 This product operates at a 5 V supply voltage for reliable performance. This product is an Provides a platform for evaluating a two-channel 12-bit ADC operating at sampling rates of up to 800 MSPS. This tool is designed for the ADS540x ADS54T0x. SPI USB interface type

ADS5404EVM Image

ADS5404EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5404EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series ADS5404
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS540x ADS54T0x
  • Sampling-Rate-Per-Second 500M
  • Data-Interface DDR LVDS
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 1 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5404
  • Power-Typ-Conditions 1.84W @ 500MSPS
  • Operating-Supply-Voltage 5 V
  • Description-Function Provides a platform for evaluating a two-channel 12-bit ADC operating at sampling rates of up to 800 MSPS
  • Tool-Is-For-Evaluation-Of ADS540x ADS54T0x
  • Interface-Type SPI USB

ADS5404EVM

ADS5404EVM Specifications

ADS5404EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed ADS5404

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed ADS540x ADS54T0x

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 500M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is DDR LVDS.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 2.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 1 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS5404

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Provides a platform for evaluating a two-channel 12-bit ADC operating at sampling rates of up to 800 MSPS.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS540x ADS54T0x.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SPI USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$95.90
$95.90
10
$91.10
$911.00
100
$86.31
$8 630.55
500
$81.51
$40 755.40
1000
$76.72
$76 716.00
Top