ADS5409EVM

Mfr. #: ADS5409EVM
Manufacturer: Texas Instruments
Description: MODULE EVAL FOR ADS5409
Lifecycle: New from this manufacturer.
Datasheet: ADS5409EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5409EVM Overview

Product belongs to the ADS5409 series. This product is categorized as Evaluation Modules Type: ADC This product is designed ADS540x amplifier. This product's 900M. Data-Interface: DDR LVDS 12 bits 2 units Input range: 1 Vpp Included item: Board. IC package type: ADS5409 This product operates at a 5 V supply voltage for reliable performance. This product is an ADS5409 - 12 Bit 900M Samples per Second Analog to Digital Converter (ADC) Evaluation Board. This tool is designed for the ADS540x. GUI interface type

ADS5409EVM Image

ADS5409EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5409EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series ADS5409
  • Product Evaluation Modules
  • Type ADC
  • For-Use-With ADS540x
  • Sampling-Rate-Per-Second 900M
  • Data-Interface DDR LVDS
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 1 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5409
  • Power-Typ-Conditions 2.27W @ 900MSPS
  • Operating-Supply-Voltage 5 V
  • Description-Function ADS5409 - 12 Bit 900M Samples per Second Analog to Digital Converter (ADC) Evaluation Board
  • Tool-Is-For-Evaluation-Of ADS540x
  • Interface-Type GUI

ADS5409EVM

ADS5409EVM Specifications

ADS5409EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed ADS5409

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is ADS540x.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 900M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is DDR LVDS.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 12

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 1 Vpp.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS5409.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 5 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is ADS5409 - 12 Bit 900M Samples per Second Analog to Digital Converter (ADC) Evaluation Board.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS540x

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed GUI

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$748.50
$748.50
10
$711.08
$7 110.75
100
$673.65
$67 365.00
500
$636.22
$318 112.50
1000
$598.80
$598 800.00
Top