ADS5483EVM

Mfr. #: ADS5483EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR ADS5483
Lifecycle: New from this manufacturer.
Datasheet: ADS5483EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5483EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 135M. Data-Interface: Parallel 16 bits 1 units Input range: 3 Vpp Included item: Board. IC package type: ADS5483 This product operates at a 2.7 V to 5.25 V supply voltage for reliable performance. This tool is designed for the ADS5483. SMA interface type

ADS5483EVM Image

ADS5483EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5483EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 135M
  • Data-Interface Parallel
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 3 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5483
  • Power-Typ-Conditions 2.2W @ 135MSPS
  • Operating-Supply-Voltage 2.7 V to 5.25 V
  • Tool-Is-For-Evaluation-Of ADS5483
  • Interface-Type SMA

ADS5483EVM

ADS5483EVM Specifications

ADS5483EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 135M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Parallel

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 16.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 3 Vpp

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS5483

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 2.7 V to 5.25 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS5483.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$346.20
$346.20
10
$328.89
$3 288.90
100
$311.58
$31 158.00
500
$294.27
$147 135.00
1000
$276.96
$276 960.00
Top