ADS54T02EVM

Mfr. #: ADS54T02EVM
Manufacturer: Texas Instruments
Description: EVALUATION MODULE FOR ADS5402
Lifecycle: New from this manufacturer.
Datasheet: ADS54T02EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS54T02EVM Overview

Product belongs to the - series. This product's 750M. Data-Interface: DDR LVDS 12 bits 2 units Input range: 1 Vpp Included item: Board. IC package type: ADS54T02

ADS54T02EVM Image

ADS54T02EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS54T02EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 750M
  • Data-Interface DDR LVDS
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 1 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS54T02
  • Power-Typ-Conditions 2.1W @ 750MSPS

ADS54T02EVM

ADS54T02EVM Specifications

ADS54T02EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 750M

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is DDR LVDS.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 2

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 1 Vpp.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS54T02.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$577.80
$577.80
10
$548.91
$5 489.10
100
$520.02
$52 002.00
500
$491.13
$245 565.00
1000
$462.24
$462 240.00
Top