ADS5547EVM

Mfr. #: ADS5547EVM
Manufacturer: Texas Instruments
Description: ADS5547EVM
Lifecycle: New from this manufacturer.
Datasheet: ADS5547EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS5547EVM Overview

Product belongs to the - series. This product's 210M. Data-Interface: Serial, Parallel 14 bits 1 units Input range: 1 ~ 2 Vpp Included item: Board. IC package type: ADS5547

ADS5547EVM Image

ADS5547EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5547EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 210M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 14
  • Number-of-A-D-Converters 1
  • Input-Range 1 ~ 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS5547
  • Power-Typ-Conditions 1.23W @ 210MSPS

ADS5547EVM

ADS5547EVM Specifications

ADS5547EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 210M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial, Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 14

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 1 ~ 2 Vpp.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS5547

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$57.46
$57.46
10
$54.59
$545.92
100
$51.72
$5 171.85
500
$48.85
$24 422.65
1000
$45.97
$45 972.00
Top