| Mfr. #: | ADS5560EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVAL MODULE FOR ADS5560 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | ADS5560EVM Datasheet |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 40M. Data-Interface: Serial, Parallel 16 bits 1 units Input range: 3.56 Vpp Included item: Board. IC package type: ADS5560 This product operates at a 1.8 V to 5 V supply voltage for reliable performance. SMA SPI interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS5560EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed ADC
A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?
Q: Yes, the product's Sampling-Rate-Per-Second is indeed 40M
A: What is the Data-Interface of the product?
Q: The Data-Interface of the product is Serial, Parallel.
A: What is the Number-of-Bits of the product?
Q: The Number-of-Bits of the product is 16.
A: What is the Number-of-A-D-Converters of the product?
Q: The Number-of-A-D-Converters of the product is 1.
A: At what frequency does the Input-Range?
Q: The product Input-Range is 3.56 Vpp.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is ADS5560.
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 1.8 V to 5 V.
A: Is the cutoff frequency of the product Interface-Type?
Q: Yes, the product's Interface-Type is indeed SMA SPI