ADS6224EVM

Mfr. #: ADS6224EVM
Manufacturer: Texas Instruments
Description: ADS6224EVM
Lifecycle: New from this manufacturer.
Datasheet: ADS6224EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS6224EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 105M. Data-Interface: Serial, Parallel 12 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS6224 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS6224. SMA interface type

ADS6224EVM Image

ADS6224EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS6224EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 105M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS6224
  • Power-Typ-Conditions 405mW @ 105MSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS6224
  • Interface-Type SMA

ADS6224EVM

ADS6224EVM Specifications

ADS6224EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 105M.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Serial, Parallel.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: Is the cutoff frequency of the product Input-Range?

    Q: Yes, the product's Input-Range is indeed 2 Vpp

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS6224

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS6224.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$336.02
$336.02
10
$319.21
$3 192.14
100
$302.41
$30 241.35
500
$285.61
$142 806.40
1000
$268.81
$268 812.00
Top