ADS6245EVM

Mfr. #: ADS6245EVM
Manufacturer: Texas Instruments
Description: ADS6245EVM
Lifecycle: New from this manufacturer.
Datasheet: ADS6245EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS6245EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 125M. Data-Interface: Serial, Parallel 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS6245 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS6245. SMA interface type

ADS6245EVM Image

ADS6245EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS6245EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 125M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS6245
  • Power-Typ-Conditions 500mW @ 125MSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS6245
  • Interface-Type SMA

ADS6245EVM

ADS6245EVM Specifications

ADS6245EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 125M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial, Parallel.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 14.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 2.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 2 Vpp.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS6245

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V to 5 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is ADS6245.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$336.02
$336.02
10
$319.21
$3 192.14
100
$302.41
$30 241.35
500
$285.61
$142 806.40
1000
$268.81
$268 812.00
Top