ADS62P44EVM

Mfr. #: ADS62P44EVM
Manufacturer: Texas Instruments
Description: ADS62P44EVM
Lifecycle: New from this manufacturer.
Datasheet: ADS62P44EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS62P44EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 105M. Data-Interface: Serial, Parallel 14 bits 2 units Input range: 2 Vpp Included item: Board. IC package type: ADS62P44 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS62P44. SMA SPI interface type

ADS62P44EVM Image

ADS62P44EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS62P44EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 105M
  • Data-Interface Serial, Parallel
  • Number-of-Bits 14
  • Number-of-A-D-Converters 2
  • Input-Range 2 Vpp
  • Supplied-Contents Board
  • Utilized-IC-Part ADS62P44
  • Power-Typ-Conditions 710mW @ 105MSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS62P44
  • Interface-Type SMA SPI

ADS62P44EVM

ADS62P44EVM Specifications

ADS62P44EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 105M.

  • A: Is the cutoff frequency of the product Data-Interface?

    Q: Yes, the product's Data-Interface is indeed Serial, Parallel

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 14.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 2.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 2 Vpp.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS62P44.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS62P44.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$0.00
$0.00
10
$0.00
$0.00
100
$0.00
$0.00
500
$0.00
$0.00
1000
$0.00
$0.00
Top