| Mfr. #: | ADS7834EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVAL MOD FOR ADS7834 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | ADS7834EVM Datasheet |


Product belongs to the - series. This product's 500k. Data-Interface: Serial 12 bits 1 units Input range: 0 ~ VREF Included item: Board. IC package type: ADS7834

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7834EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: What is the Sampling-Rate-Per-Second of the product?
Q: The Sampling-Rate-Per-Second of the product is 500k.
A: At what frequency does the Data-Interface?
Q: The product Data-Interface is Serial.
A: What is the Number-of-Bits of the product?
Q: The Number-of-Bits of the product is 12.
A: At what frequency does the Number-of-A-D-Converters?
Q: The product Number-of-A-D-Converters is 1.
A: Is the cutoff frequency of the product Input-Range?
Q: Yes, the product's Input-Range is indeed 0 ~ VREF
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is ADS7834.