ADS7845EVM

Mfr. #: ADS7845EVM
Manufacturer: Texas Instruments
Description: MODULE EVAL FOR ADS7845
Lifecycle: New from this manufacturer.
Datasheet: ADS7845EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7845EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards The Interface, Touch Screen Controller is the Main-Purpose. Primary-Attributes: 5-Wire Resistive Touch Screen Controller, Serial Interface, 12-Bit ADC IC package type: ADS7845 This tool is designed for the ADS7845. I2C SPI interface type

ADS7845EVM Image

ADS7845EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7845EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Main-Purpose Interface, Touch Screen Controller
  • Primary-Attributes 5-Wire Resistive Touch Screen Controller, Serial Interface, 12-Bit ADC
  • Embedded No
  • Utilized-IC-Part ADS7845
  • Tool-Is-For-Evaluation-Of ADS7845
  • Interface-Type I2C SPI

ADS7845EVM

ADS7845EVM Specifications

ADS7845EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Touch Screen Controller

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 5-Wire Resistive Touch Screen Controller, Serial Interface, 12-Bit ADC.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS7845.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS7845

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is I2C SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00
Top