| Mfr. #: | ADS7866EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | MODULE EVAL FOR ADS7866 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | ADS7866EVM Datasheet |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 200k. Data-Interface: Serial 12 bits 1 units Input range: 0 ~ 3.6 V Included item: Board. IC package type: ADS7866 This product operates at a 1.2 V to 3.6 V supply voltage for reliable performance. This tool is designed for the ADS7866.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7866EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: What is the Type of the product?
Q: The Type of the product is ADC.
A: At what frequency does the Sampling-Rate-Per-Second?
Q: The product Sampling-Rate-Per-Second is 200k.
A: At what frequency does the Data-Interface?
Q: The product Data-Interface is Serial.
A: What is the Number-of-Bits of the product?
Q: The Number-of-Bits of the product is 12.
A: What is the Number-of-A-D-Converters of the product?
Q: The Number-of-A-D-Converters of the product is 1.
A: What is the Input-Range of the product?
Q: The Input-Range of the product is 0 ~ 3.6 V.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed ADS7866
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 1.2 V to 3.6 V
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS7866