ADS7886EVM

Mfr. #: ADS7886EVM
Manufacturer: Texas Instruments
Description: EVALUATION MODULE FOR ADS7886
Lifecycle: New from this manufacturer.
Datasheet: ADS7886EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7886EVM Overview

Product belongs to the microPOWER series. This product is categorized as Evaluation Boards Type: ADC This product's 1M. Data-Interface: Parallel 12 bits 1 units Input range: 0 ~ 5.25 V Included item: Board. IC package type: ADS7886 This product operates at a 2.35 V to 5.25 V supply voltage for reliable performance. This tool is designed for the ADS7886.

ADS7886EVM Image

ADS7886EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7886EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 1M
  • Data-Interface Parallel
  • Number-of-Bits 12
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 5.25 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7886
  • Power-Typ-Conditions 3.9mW @ 3 V, 7.5mW @ 5 V
  • Operating-Supply-Voltage 2.35 V to 5.25 V
  • Tool-Is-For-Evaluation-Of ADS7886

ADS7886EVM

ADS7886EVM Specifications

ADS7886EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed microPOWER

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 1M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Parallel.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 12.

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ 5.25 V.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS7886.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 2.35 V to 5.25 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS7886.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00
Top