| Mfr. #: | ADS7887EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVALUATION MODULE FOR ADS7887 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | ADS7887EVM Datasheet |


Product belongs to the microPOWER series. This product is categorized as Evaluation Boards Type: ADC This product's 1.25M. Data-Interface: Serial 10 bits 1 units Input range: 0 ~ 5.25 V Included item: Board. IC package type: ADS7887 This product operates at a 2.35 V to 5.25 V supply voltage for reliable performance. This tool is designed for the ADS7887.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7887EVM Specifications
A: What is the Series of the product?
Q: The Series of the product is microPOWER.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed ADC
A: What is the Sampling-Rate-Per-Second of the product?
Q: The Sampling-Rate-Per-Second of the product is 1.25M.
A: At what frequency does the Data-Interface?
Q: The product Data-Interface is Serial.
A: What is the Number-of-Bits of the product?
Q: The Number-of-Bits of the product is 10.
A: At what frequency does the Number-of-A-D-Converters?
Q: The product Number-of-A-D-Converters is 1.
A: Is the cutoff frequency of the product Input-Range?
Q: Yes, the product's Input-Range is indeed 0 ~ 5.25 V
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed ADS7887
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 2.35 V to 5.25 V
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is ADS7887.