ADS7957EVM

Mfr. #: ADS7957EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR ADS7957
Lifecycle: New from this manufacturer.
Datasheet: ADS7957EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS7957EVM Overview

Product belongs to the - series. This product's 1M. Data-Interface: Serial 10 bits 1 units Input range: - Included item: Board. IC package type: ADS7957

ADS7957EVM Image

ADS7957EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS7957EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 1M
  • Data-Interface Serial
  • Number-of-Bits 10
  • Number-of-A-D-Converters 1
  • Input-Range -
  • Supplied-Contents Board
  • Utilized-IC-Part ADS7957
  • Power-Typ-Conditions -

ADS7957EVM

ADS7957EVM Specifications

ADS7957EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 1M.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 10

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS7957

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$0.00
$0.00
10
$0.00
$0.00
100
$0.00
$0.00
500
$0.00
$0.00
1000
$0.00
$0.00
Top