ADS8317EVM-PDK

Mfr. #: ADS8317EVM-PDK
Manufacturer: Texas Instruments
Description: KIT PERFORMANCE DEMO FOR ADS8317
Lifecycle: New from this manufacturer.
Datasheet: ADS8317EVM-PDK Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8317EVM-PDK Overview

Product belongs to the microPOWER series. This product is categorized as Evaluation Boards Type: ADC This product's 250k. Data-Interface: SPI 16 bits 1 units Input range: 0 ~ 5 V Included item: 2 Boards. IC package type: ADS8317 This product operates at a 1.8 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS8317. USB interface type

ADS8317EVM-PDK Image

ADS8317EVM-PDK

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8317EVM-PDK Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 250k
  • Data-Interface SPI
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 5 V
  • Supplied-Contents 2 Boards
  • Utilized-IC-Part ADS8317
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 1.8 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS8317
  • Interface-Type USB

ADS8317EVM-PDK

ADS8317EVM-PDK Specifications

ADS8317EVM-PDK FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is microPOWER.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 250k.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is SPI.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 16

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ 5 V.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed 2 Boards

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS8317.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.8 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS8317.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$172.52
$172.52
10
$163.89
$1 638.89
100
$155.26
$15 526.35
500
$146.64
$73 318.90
1000
$138.01
$138 012.00
Top