ADS8317EVM

Mfr. #: ADS8317EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR ADS8317
Lifecycle: New from this manufacturer.
Datasheet: ADS8317EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8317EVM Overview

Product belongs to the microPOWER series. This product's 250k. Data-Interface: SPI 16 bits 1 units Input range: 0 ~ 5 V Included item: Board. IC package type: ADS8317

ADS8317EVM Image

ADS8317EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8317EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series microPOWER
  • Sampling-Rate-Per-Second 250k
  • Data-Interface SPI
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 5 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8317
  • Power-Typ-Conditions -

ADS8317EVM

ADS8317EVM Specifications

ADS8317EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is microPOWER.

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 250k.

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is SPI.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 16.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 0 ~ 5 V.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS8317.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$96.70
$96.70
10
$91.87
$918.70
100
$87.03
$8 703.45
500
$82.20
$41 099.65
1000
$77.36
$77 364.00
Top