ADS8342EVM

Mfr. #: ADS8342EVM
Manufacturer: Texas Instruments
Description: EVALUATION MODULE FOR ADS8342
Lifecycle: New from this manufacturer.
Datasheet: ADS8342EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8342EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 250k. Data-Interface: Parallel 16 bits 1 units Input range: ±2.5 V Included item: Board. IC package type: ADS8342 This product operates at a 1.8 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS8342. SMA interface type

ADS8342EVM Image

ADS8342EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8342EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 250k
  • Data-Interface Parallel
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range ±2.5 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8342
  • Power-Typ-Conditions 200mW @ 250kSPS
  • Operating-Supply-Voltage 1.8 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS8342
  • Interface-Type SMA

ADS8342EVM

ADS8342EVM Specifications

ADS8342EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 250k

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Parallel.

  • A: Is the cutoff frequency of the product Number-of-Bits?

    Q: Yes, the product's Number-of-Bits is indeed 16

  • A: Is the cutoff frequency of the product Number-of-A-D-Converters?

    Q: Yes, the product's Number-of-A-D-Converters is indeed 1

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is ±2.5 V.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS8342.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 1.8 V to 5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS8342

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$114.63
$114.63
10
$108.90
$1 088.98
100
$103.17
$10 316.70
500
$97.44
$48 717.75
1000
$91.70
$91 704.00
Top