ADS8345EVM

Mfr. #: ADS8345EVM
Manufacturer: Texas Instruments
Description: EVAL MOD FOR ADS8345
Lifecycle: New from this manufacturer.
Datasheet: ADS8345EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8345EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 100k. Data-Interface: Serial 16 bits 1 units Input range: ±2.5 V Included item: Board. IC package type: ADS8345 This product operates at a 2.7 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS8345.

ADS8345EVM Image

ADS8345EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8345EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 100k
  • Data-Interface Serial
  • Number-of-Bits 16
  • Number-of-A-D-Converters 1
  • Input-Range ±2.5 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8345
  • Power-Typ-Conditions 8mW @ 100kSPS
  • Operating-Supply-Voltage 2.7 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS8345

ADS8345EVM

ADS8345EVM Specifications

ADS8345EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC

  • A: What is the Sampling-Rate-Per-Second of the product?

    Q: The Sampling-Rate-Per-Second of the product is 100k.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Serial.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 16.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is ±2.5 V.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is ADS8345.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.7 V to 5 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is ADS8345.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$56.74
$56.74
10
$53.91
$539.08
100
$51.07
$5 107.05
500
$48.23
$24 116.65
1000
$45.40
$45 396.00
Top