| Mfr. #: | ADS8371EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVALUATION MODULE FOR ADS8371 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | ADS8371EVM Datasheet |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 750k. Data-Interface: Parallel 16 bits 1 units Input range: 0 ~ 4.096 V Included item: Board. IC package type: ADS8371 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS8371.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8371EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is ADC.
A: At what frequency does the Sampling-Rate-Per-Second?
Q: The product Sampling-Rate-Per-Second is 750k.
A: What is the Data-Interface of the product?
Q: The Data-Interface of the product is Parallel.
A: At what frequency does the Number-of-Bits?
Q: The product Number-of-Bits is 16.
A: What is the Number-of-A-D-Converters of the product?
Q: The Number-of-A-D-Converters of the product is 1.
A: At what frequency does the Input-Range?
Q: The product Input-Range is 0 ~ 4.096 V.
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is ADS8371.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is ADS8371.