ADS8381EVM

Mfr. #: ADS8381EVM
Manufacturer: Texas Instruments
Description: EVALUATION MODULE FOR ADS8381
Lifecycle: New from this manufacturer.
Datasheet: ADS8381EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8381EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 580k. Data-Interface: Parallel 18 bits 1 units Input range: 0 ~ 4.2 V Included item: Board. IC package type: ADS8381 This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the ADS8381. SMA interface type

ADS8381EVM Image

ADS8381EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8381EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 580k
  • Data-Interface Parallel
  • Number-of-Bits 18
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 4.2 V
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8381
  • Power-Typ-Conditions 115mW @ 580kSPS
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of ADS8381
  • Interface-Type SMA

ADS8381EVM

ADS8381EVM Specifications

ADS8381EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 580k

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Parallel.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 18.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 1.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is 0 ~ 4.2 V.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is ADS8381.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS8381

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$114.63
$114.63
10
$108.90
$1 088.98
100
$103.17
$10 316.70
500
$97.44
$48 717.75
1000
$91.70
$91 704.00
Top