| Mfr. #: | ADS8556EVM |
|---|---|
| Manufacturer: | Texas Instruments |
| Description: | EVAL MODULE FOR ADS8556 |
| Lifecycle: | New from this manufacturer. |
| Datasheet: | ADS8556EVM Datasheet |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 450k, 630k. Data-Interface: Serial, Parallel 16 bits 6 units Input range: ±4 x VREF Included item: Board. IC package type: ADS8556 This product operates at a 5 V to 15 V supply voltage for reliable performance. This tool is designed for the ADS8556 ADS8557 ADS8558. SMA interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8556EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: What is the Type of the product?
Q: The Type of the product is ADC.
A: What is the Sampling-Rate-Per-Second of the product?
Q: The Sampling-Rate-Per-Second of the product is 450k, 630k.
A: At what frequency does the Data-Interface?
Q: The product Data-Interface is Serial, Parallel.
A: At what frequency does the Number-of-Bits?
Q: The product Number-of-Bits is 16.
A: What is the Number-of-A-D-Converters of the product?
Q: The Number-of-A-D-Converters of the product is 6.
A: At what frequency does the Input-Range?
Q: The product Input-Range is ±4 x VREF.
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed ADS8556
A: At what frequency does the Operating-Supply-Voltage?
Q: The product Operating-Supply-Voltage is 5 V to 15 V.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS8556 ADS8557 ADS8558
A: Is the cutoff frequency of the product Interface-Type?
Q: Yes, the product's Interface-Type is indeed SMA