ADS8557EVM

Mfr. #: ADS8557EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR ADS8557
Lifecycle: New from this manufacturer.
Datasheet: ADS8557EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
ADS8557EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC This product's 470k, 670k. Data-Interface: Serial, Parallel 14 bits 6 units Input range: ±4 x VREF Included item: Board. IC package type: ADS8557 This product operates at a 5 V +/- 15 V supply voltage for reliable performance. This tool is designed for the ADS8557.

ADS8557EVM Image

ADS8557EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

ADS8557EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Sampling-Rate-Per-Second 470k, 670k
  • Data-Interface Serial, Parallel
  • Number-of-Bits 14
  • Number-of-A-D-Converters 6
  • Input-Range ±4 x VREF
  • Supplied-Contents Board
  • Utilized-IC-Part ADS8557
  • Power-Typ-Conditions -
  • Operating-Supply-Voltage 5 V +/- 15 V
  • Tool-Is-For-Evaluation-Of ADS8557

ADS8557EVM

ADS8557EVM Specifications

ADS8557EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is ADC.

  • A: Is the cutoff frequency of the product Sampling-Rate-Per-Second?

    Q: Yes, the product's Sampling-Rate-Per-Second is indeed 470k, 670k

  • A: At what frequency does the Data-Interface?

    Q: The product Data-Interface is Serial, Parallel.

  • A: What is the Number-of-Bits of the product?

    Q: The Number-of-Bits of the product is 14.

  • A: At what frequency does the Number-of-A-D-Converters?

    Q: The product Number-of-A-D-Converters is 6.

  • A: At what frequency does the Input-Range?

    Q: The product Input-Range is ±4 x VREF.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed ADS8557

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V +/- 15 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed ADS8557

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$114.63
$114.63
10
$108.90
$1 088.98
100
$103.17
$10 316.70
500
$97.44
$48 717.75
1000
$91.70
$91 704.00
Top