AFE4403EVM

Mfr. #: AFE4403EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR AFE4403
Lifecycle: New from this manufacturer.
Datasheet: AFE4403EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE4403EVM Overview

Product belongs to the AFE4403 series. This product is categorized as Evaluation Modules Type: Ultrasound AFE This product is designed AFE4403 amplifier. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: Medical Pulse Oximeter Applications IC package type: AFE4403 This product operates at a 2 V to 3.6 V supply voltage for reliable performance. This product is an AFE4403 evaluation board for heart rate monitors and low-cost pulse oximeters. This tool is designed for the AFE4403. SPI USB interface type

AFE4403EVM Image

AFE4403EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE4403EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series AFE4403
  • Product Evaluation Modules
  • Type Ultrasound AFE
  • For-Use-With AFE4403
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes Medical Pulse Oximeter Applications
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part AFE4403
  • Operating-Supply-Voltage 2 V to 3.6 V
  • Description-Function AFE4403 evaluation board for heart rate monitors and low-cost pulse oximeters
  • Tool-Is-For-Evaluation-Of AFE4403
  • Interface-Type SPI USB

AFE4403EVM

AFE4403EVM Specifications

AFE4403EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is AFE4403.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Ultrasound AFE

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed AFE4403

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Interface, Analog Front End (AFE).

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is Medical Pulse Oximeter Applications.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is AFE4403.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 2 V to 3.6 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is AFE4403 evaluation board for heart rate monitors and low-cost pulse oximeters.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is AFE4403.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$298.50
$298.50
10
$283.58
$2 835.75
100
$268.65
$26 865.00
500
$253.72
$126 862.50
1000
$238.80
$238 800.00
Top