AFE5803EVM

Mfr. #: AFE5803EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR AFE5803
Lifecycle: New from this manufacturer.
Datasheet: AFE5803EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE5803EVM Overview

Product belongs to the - series. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: 8 Channel LVDS Outputs IC package type: AFE5803 Maximum operating temperature of + 70 C SPI interface type

AFE5803EVM Image

AFE5803EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE5803EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes 8 Channel LVDS Outputs
  • Embedded No
  • Utilized-IC-Part AFE5803
  • Maximum-Operating-Temperature + 70 C
  • Interface-Type SPI

AFE5803EVM

AFE5803EVM Specifications

AFE5803EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Analog Front End (AFE)

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 8 Channel LVDS Outputs.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed AFE5803

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 70 C.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$57.46
$57.46
10
$54.59
$545.92
100
$51.72
$5 171.85
500
$48.85
$24 422.65
1000
$45.97
$45 972.00
Top