AFE5809EVM

Mfr. #: AFE5809EVM
Manufacturer: Texas Instruments
Description: MODULE EVAL FOR AFE5809
Lifecycle: New from this manufacturer.
Datasheet: AFE5809EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE5809EVM Overview

Product belongs to the - series. The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: 8 Channel LVDS Outputs IC package type: AFE5809

AFE5809EVM Image

AFE5809EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE5809EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes 8 Channel LVDS Outputs
  • Embedded No
  • Utilized-IC-Part AFE5809

AFE5809EVM

AFE5809EVM Specifications

AFE5809EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Interface, Analog Front End (AFE).

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is 8 Channel LVDS Outputs.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is AFE5809.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$448.50
$448.50
10
$426.08
$4 260.75
100
$403.65
$40 365.00
500
$381.22
$190 612.50
1000
$358.80
$358 800.00