AFE5851EVM

Mfr. #: AFE5851EVM
Manufacturer: Texas Instruments
Description: EVAL BOARD FOR AFE5851
Lifecycle: New from this manufacturer.
Datasheet: AFE5851EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE5851EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: ADC Bulk is the packaging method for this product The Interface, Analog Front End (AFE) is the Main-Purpose. Primary-Attributes: 16 Channel Variable Gain Amplifier (VGA), 8 Channel LVDS IC package type: AFE5851 This product operates at a 1.8 V to 3.3 V supply voltage for reliable performance. This tool is designed for the AFE5851. SMA USB interface type

AFE5851EVM Image

AFE5851EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE5851EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type ADC
  • Packaging Bulk
  • Main-Purpose Interface, Analog Front End (AFE)
  • Primary-Attributes 16 Channel Variable Gain Amplifier (VGA), 8 Channel LVDS
  • Embedded No
  • Utilized-IC-Part AFE5851
  • Operating-Supply-Voltage 1.8 V to 3.3 V
  • Tool-Is-For-Evaluation-Of AFE5851
  • Interface-Type SMA USB

AFE5851EVM

AFE5851EVM Specifications

AFE5851EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is ADC.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Analog Front End (AFE)

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 16 Channel Variable Gain Amplifier (VGA), 8 Channel LVDS.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is AFE5851.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 1.8 V to 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed AFE5851

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SMA USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$346.20
$346.20
10
$328.89
$3 288.90
100
$311.58
$31 158.00
500
$294.27
$147 135.00
1000
$276.96
$276 960.00
Top