AFE7070EVM

Mfr. #: AFE7070EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR AFE7070
Lifecycle: New from this manufacturer.
Datasheet: AFE7070EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AFE7070EVM Overview

This product is categorized as Evaluation Modules Type: DAC This product is designed AFE7070 amplifier. Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C This product operates at a 1 V to 2.6 V supply voltage for reliable performance. This product is an Evaluation module for the AFE7070 digital to analog converter. This tool is designed for the AFE7070. SPI interface type

AFE7070EVM Image

AFE7070EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AFE7070EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Modules
  • Type DAC
  • For-Use-With AFE7070
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 1 V to 2.6 V
  • Description-Function Evaluation module for the AFE7070 digital to analog converter
  • Tool-Is-For-Evaluation-Of AFE7070
  • Interface-Type SPI

AFE7070EVM

AFE7070EVM Specifications

AFE7070EVM FAQ
  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed AFE7070

  • A: Is the cutoff frequency of the product Maximum-Operating-Temperature?

    Q: Yes, the product's Maximum-Operating-Temperature is indeed + 85 C

  • A: Is the cutoff frequency of the product Minimum-Operating-Temperature?

    Q: Yes, the product's Minimum-Operating-Temperature is indeed - 40 C

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 1 V to 2.6 V

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is Evaluation module for the AFE7070 digital to analog converter.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed AFE7070

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$0.00
$0.00
10
$0.00
$0.00
100
$0.00
$0.00
500
$0.00
$0.00
1000
$0.00
$0.00
Top