AMPQUICKKIT-EVM

Mfr. #: AMPQUICKKIT-EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR AMPQUICKKIT
Lifecycle: New from this manufacturer.
Datasheet: AMPQUICKKIT-EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
AMPQUICKKIT-EVM Overview

Product belongs to the - series. Bulk is the packaging method for this product Operational temperature range: - Output-Type: Single-Ended Voltage supply range: - The - The -. Current-Output-Channel is - The amplifier is of General Purpose type. Included item: Board, Samples. IC package type: OPA170, OPA171, OPA172, OPA313, OPA314, OPA316 Board type: Bare (Unpopulated). The product has 1 - Single channel per IC.

AMPQUICKKIT-EVM Image

AMPQUICKKIT-EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

AMPQUICKKIT-EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Packaging Bulk
  • Operating-Temperature -
  • Output-Type Single-Ended
  • Voltage-Supply-Single-Dual -
  • -3db-Bandwidth -
  • Slew-Rate -
  • Current-Output-Channel -
  • Amplifier-Type General Purpose
  • Supplied-Contents Board, Samples
  • Utilized-IC-Part OPA170, OPA171, OPA172, OPA313, OPA314, OPA316
  • Board-Type Bare (Unpopulated)
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC -

AMPQUICKKIT-EVM

AMPQUICKKIT-EVM Specifications

AMPQUICKKIT-EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Operating-Temperature of the product?

    Q: The Operating-Temperature of the product is -.

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed Single-Ended

  • A: Is the cutoff frequency of the product Voltage-Supply-Single-Dual?

    Q: Yes, the product's Voltage-Supply-Single-Dual is indeed -

  • A: At what frequency does the -3db-Bandwidth?

    Q: The product -3db-Bandwidth is -.

  • A: Is the cutoff frequency of the product Slew-Rate?

    Q: Yes, the product's Slew-Rate is indeed -

  • A: What is the Current-Output-Channel of the product?

    Q: The Current-Output-Channel of the product is -.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is General Purpose.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board, Samples

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is OPA170, OPA171, OPA172, OPA313, OPA314, OPA316.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Bare (Unpopulated)

  • A: At what frequency does the Channels-per-IC?

    Q: The product Channels-per-IC is 1 - Single.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$43.50
$43.50
10
$41.32
$413.25
100
$39.15
$3 915.00
500
$36.98
$18 487.50
1000
$34.80
$34 800.00
Top