BQ3055EVM

Mfr. #: BQ3055EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR BQ3055
Lifecycle: New from this manufacturer.
Datasheet: BQ3055EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ3055EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Battery Management The Power Management, Battery Gauge is the Main-Purpose. Primary-Attributes: - IC package type: BQ29440, BQ3055 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C Output voltage: 2.5 V 3.3 V This tool is designed for the BQ3055. Input Voltage Range: 25 V

BQ3055EVM Image

BQ3055EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ3055EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Battery Management
  • Main-Purpose Power Management, Battery Gauge
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part BQ29440, BQ3055
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Output-Voltage 2.5 V 3.3 V
  • Tool-Is-For-Evaluation-Of BQ3055
  • Input-Voltage 25 V

BQ3055EVM

BQ3055EVM Specifications

BQ3055EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Battery Management

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Power Management, Battery Gauge.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed BQ29440, BQ3055

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 85 C.

  • A: At what frequency does the Minimum-Operating-Temperature?

    Q: The product Minimum-Operating-Temperature is - 40 C.

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed 2.5 V 3.3 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed BQ3055

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 25 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$149.24
$149.24
10
$141.77
$1 417.73
100
$134.31
$13 431.15
500
$126.85
$63 424.90
1000
$119.39
$119 388.00
Top