BQ3060EVM

Mfr. #: BQ3060EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR BQ3060
Lifecycle: New from this manufacturer.
Datasheet: BQ3060EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ3060EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Battery Management This product is designed EV2300 amplifier. The Power Management, Battery Gauge is the Main-Purpose. Primary-Attributes: Li-Ion/Li-Polymer, 2 ~ 4 Cells IC package type: BQ3060, BQ29412 This product is an This evaluation module (EVM) is a complete evaluation system for the bq3060/bq29412 battery management system. This tool is designed for the BQ3060 BQ29412. USB interface type Our product measures 100 mm x 30 mm in dimensions for compact and convenient use. Input Voltage Range: 15 V Output current: 7 A

BQ3060EVM Image

BQ3060EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ3060EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Battery Management
  • For-Use-With EV2300
  • Main-Purpose Power Management, Battery Gauge
  • Primary-Attributes Li-Ion/Li-Polymer, 2 ~ 4 Cells
  • Embedded No
  • Utilized-IC-Part BQ3060, BQ29412
  • Description-Function This evaluation module (EVM) is a complete evaluation system for the bq3060/bq29412 battery management system
  • Tool-Is-For-Evaluation-Of BQ3060 BQ29412
  • Interface-Type USB
  • Dimensions 100 mm x 30 mm
  • Input-Voltage 15 V
  • Output-Current 7 A

BQ3060EVM

BQ3060EVM Specifications

BQ3060EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Battery Management

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed EV2300

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Battery Gauge

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is Li-Ion/Li-Polymer, 2 ~ 4 Cells.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is BQ3060, BQ29412.

  • A: What is the Description-Function of the product?

    Q: The Description-Function of the product is This evaluation module (EVM) is a complete evaluation system for the bq3060/bq29412 battery management system.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed BQ3060 BQ29412

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 100 mm x 30 mm

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 15 V.

  • A: Is the cutoff frequency of the product Output-Current?

    Q: Yes, the product's Output-Current is indeed 7 A

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$149.08
$149.08
10
$141.63
$1 416.31
100
$134.18
$13 417.65
500
$126.72
$63 361.15
1000
$119.27
$119 268.00
Top