BQ50002EVM-607

Mfr. #: BQ50002EVM-607
Manufacturer: Texas Instruments
Description: WIRELESS POWER TRANSMITTER EVALU
Lifecycle: New from this manufacturer.
Datasheet: BQ50002EVM-607 Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
BQ50002EVM-607 Overview

Product belongs to the bqTESLA series. This product is categorized as Evaluation Modules Type: Wireless Charging - Transmitters The Power Management, Wireless Power Supply is the Main-Purpose. Primary-Attributes: Transmitter IC package type: BQ50002 Output voltage: 5 V This product is an BQ50002 wireless power transmitter evaluation module. This tool is designed for the BQ50002. I2C USB interface type Input Voltage Range: 5 V Output current: 1.5 A

BQ50002EVM-607 Image

BQ50002EVM-607

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

BQ50002EVM-607 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series bqTESLA
  • Product Evaluation Modules
  • Type Wireless Charging - Transmitters
  • Main-Purpose Power Management, Wireless Power Supply
  • Primary-Attributes Transmitter
  • Embedded -
  • Utilized-IC-Part BQ50002
  • Output-Voltage 5 V
  • Description-Function BQ50002 wireless power transmitter evaluation module
  • Tool-Is-For-Evaluation-Of BQ50002
  • Interface-Type I2C USB
  • Input-Voltage 5 V
  • Output-Current 1.5 A

BQ50002EVM-607

BQ50002EVM-607 Specifications

BQ50002EVM-607 FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed bqTESLA

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Wireless Charging - Transmitters.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Wireless Power Supply

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is Transmitter.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is BQ50002.

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is 5 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed BQ50002 wireless power transmitter evaluation module

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is BQ50002.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is I2C USB.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 5 V.

  • A: What is the Output-Current of the product?

    Q: The Output-Current of the product is 1.5 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$218.36
$218.36
10
$207.44
$2 074.44
100
$196.53
$19 652.58
500
$185.61
$92 803.85
1000
$174.69
$174 689.60
Top