CDCE62005EVM

Mfr. #: CDCE62005EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR CDCE62005
Lifecycle: New from this manufacturer.
Datasheet: CDCE62005EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCE62005EVM Overview

Product belongs to the CDCE62005 series. This product is categorized as Evaluation Modules Type: Frequency Synthesizers Bulk is the packaging method for this product This product's 1.5 GHz range is 0Hz to 2.2GHz. The Timing, Frequency Synthesizer is the Main-Purpose. Primary-Attributes: 3 Inputs, 10 Outputs IC package type: CDCE62005 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the CDCE62005. USB interface type

CDCE62005EVM Image

CDCE62005EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCE62005EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series CDCE62005
  • Product Evaluation Modules
  • Type Frequency Synthesizers
  • Packaging Bulk
  • Frequency 1.5 GHz
  • Main-Purpose Timing, Frequency Synthesizer
  • Primary-Attributes 3 Inputs, 10 Outputs
  • Embedded No
  • Utilized-IC-Part CDCE62005
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of CDCE62005
  • Interface-Type USB

CDCE62005EVM

CDCE62005EVM Specifications

CDCE62005EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is CDCE62005.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Frequency Synthesizers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 1.5 GHz

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Frequency Synthesizer.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 3 Inputs, 10 Outputs.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed CDCE62005

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is CDCE62005.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed USB

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$298.50
$298.50
10
$283.58
$2 835.75
100
$268.65
$26 865.00
500
$253.72
$126 862.50
1000
$238.80
$238 800.00
Top