CDCE72010EVM

Mfr. #: CDCE72010EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR CDCE72010
Lifecycle: New from this manufacturer.
Datasheet: CDCE72010EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCE72010EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Clock Synchronizers Bulk is the packaging method for this product This product's 1.5 GHz range is 0Hz to 2.2GHz. The Timing, Clock Generator is the Main-Purpose. Primary-Attributes: - IC package type: CDCE72010 This product operates at a 3.3 V supply voltage for reliable performance. This product is an Evaluation module for CDCE72010 - 10 outputs low jitter clock synchronizer. This tool is designed for the CDCE72010. USB interface type

CDCE72010EVM Image

CDCE72010EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCE72010EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Clock Synchronizers
  • Packaging Bulk
  • Frequency 1.5 GHz
  • Main-Purpose Timing, Clock Generator
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part CDCE72010
  • Operating-Supply-Voltage 3.3 V
  • Description-Function Evaluation module for CDCE72010 - 10 outputs low jitter clock synchronizer
  • Tool-Is-For-Evaluation-Of CDCE72010
  • Interface-Type USB

CDCE72010EVM

CDCE72010EVM Specifications

CDCE72010EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is Clock Synchronizers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 1.5 GHz

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Timing, Clock Generator.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is CDCE72010.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Evaluation module for CDCE72010 - 10 outputs low jitter clock synchronizer

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is CDCE72010.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$230.43
$230.43
10
$218.91
$2 189.08
100
$207.39
$20 738.70
500
$195.87
$97 932.75
1000
$184.34
$184 344.00
Top