CDCLVP1208EVM

Mfr. #: CDCLVP1208EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR CDCLVP1208
Lifecycle: New from this manufacturer.
Datasheet: CDCLVP1208EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVP1208EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Clock Buffers Bulk is the packaging method for this product This product's 200 MHz 2 GHz range is 0Hz to 2.2GHz. The Timing, Clock Buffer / Driver / Receiver / Translator is the Main-Purpose. Primary-Attributes: 2 Inputs, 4 Outputs IC package type: CDCLVP1208 This product operates at a 2.375 V to 3.6 V supply voltage for reliable performance. This tool is designed for the CDCLVP1208.

CDCLVP1208EVM Image

CDCLVP1208EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVP1208EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Clock Buffers
  • Packaging Bulk
  • Frequency 200 MHz 2 GHz
  • Main-Purpose Timing, Clock Buffer / Driver / Receiver / Translator
  • Primary-Attributes 2 Inputs, 4 Outputs
  • Embedded No
  • Utilized-IC-Part CDCLVP1208
  • Operating-Supply-Voltage 2.375 V to 3.6 V
  • Tool-Is-For-Evaluation-Of CDCLVP1208

CDCLVP1208EVM

CDCLVP1208EVM Specifications

CDCLVP1208EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Clock Buffers.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 200 MHz 2 GHz.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Clock Buffer / Driver / Receiver / Translator.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 2 Inputs, 4 Outputs.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed CDCLVP1208

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.375 V to 3.6 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is CDCLVP1208.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$172.52
$172.52
10
$163.89
$1 638.89
100
$155.26
$15 526.35
500
$146.64
$73 318.90
1000
$138.01
$138 012.00
Top