CDCM6208V2EVM

Mfr. #: CDCM6208V2EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR CDCM6208V2
Lifecycle: New from this manufacturer.
Datasheet: CDCM6208V2EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCM6208V2EVM Overview

Product belongs to the - series. Bulk is the packaging method for this product The Timing, Frequency Synthesizer is the Main-Purpose. Primary-Attributes: USB Powered or External Supply IC package type: CDCM6208

CDCM6208V2EVM Image

CDCM6208V2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCM6208V2EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Packaging Bulk
  • Main-Purpose Timing, Frequency Synthesizer
  • Primary-Attributes USB Powered or External Supply
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part CDCM6208

CDCM6208V2EVM

CDCM6208V2EVM Specifications

CDCM6208V2EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Timing, Frequency Synthesizer

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is USB Powered or External Supply.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is CDCM6208.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$298.50
$298.50
10
$283.58
$2 835.75
100
$268.65
$26 865.00
500
$253.72
$126 862.50
1000
$238.80
$238 800.00
Top