DAC3162EVM

Mfr. #: DAC3162EVM
Manufacturer: Texas Instruments
Description: EVAL MODULE FOR DAC3162
Lifecycle: New from this manufacturer.
Datasheet: DAC3162EVM Datasheet
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC3162EVM Overview

Product belongs to the DAC3162 series. This product is categorized as Evaluation Boards Type: DAC This product operates at a 5 V to 7 V supply voltage for reliable performance. This tool is designed for the DAC3162.

DAC3162EVM Image

DAC3162EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC3162EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series DAC3162
  • Product Evaluation Boards
  • Type DAC
  • Operating-Supply-Voltage 5 V to 7 V
  • Tool-Is-For-Evaluation-Of DAC3162

DAC3162EVM

DAC3162EVM Specifications

DAC3162EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is DAC3162.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V to 7 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC3162.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Quantity
Unit Price
Ext. Price
1
$298.50
$298.50
10
$283.58
$2 835.75
100
$268.65
$26 865.00
500
$253.72
$126 862.50
1000
$238.80
$238 800.00
Top